• Proudly serving YorkshireLeeds, Sheffield, Bradford, Hull, York and beyond
  • Fully insuredand guaranteed
  • Free quotesNo obligation
Section through a flat roof where it meets a house wall, with part 4, the upstand, highlighted.150 mm min1234567
  1. Membrane
  2. Insulation
  3. Deck
  4. Upstand
  5. Termination bar
  6. Cover flashing
  7. Wall

Upstand

Detail · Flat roofs · also called flat roof upstand, turn-up, skirting (asphalt) · part 4 on the drawing

An upstand is the part of a flat roof's waterproofing that turns up from the roof surface onto a wall, parapet, rooflight kerb, chimney or pipe. It stops rain on the roof running into the joint. Guidance on BS 6229, the British flat roof code of practice, puts its top at least 150 mm above the finished roof level.

What an upstand does

Where a flat roof meets something upright, the waterproofing is carried up its face, so rain, splash and shallow standing water meet membrane instead of an open joint. The top edge is clamped and covered, so water running down the wall passes over it.

Bauder's summary of BS 6229:2018 gives 150 mm above the finished roof level at every abutment and penetration; IKO notes the height also deals with rain splashing up off the surface. BSI published a revised edition, BS 6229:2025, in December 2025. Bauder's summary of its changes lists no change to upstand height.

Where you will find it on a Yorkshire roof

The commonest place is a back extension or garage roof against the rear wall of a Victorian terrace or post-war semi. The covering turns up the brickwork and finishes under a lead or trim flashing set into a mortar joint, often visible from an upstairs back window.

You will also find upstands round the raised kerbs that carry rooflights and roof lanterns, around soil and vent pipes, at chimney stacks, and inside parapet walls above shops and flats. Indoors, a fault at an upstand usually shows as a damp patch on the ceiling near the wall.

Types and materials

TypeWhereHow the top is finished
Wall abutmentExtension or garage roof against the house wallTermination bar screwed through the membrane on a sealant bed, or a flashing trim set into a raked out mortar joint (Permaroof)
ParapetInside face of a low wall round the roofTaken up under the coping or held with a termination bar fixed into the masonry (SFS)
Rooflight kerbTimber or plastic kerb under a rooflightTurned up the kerb and finished under the rooflight frame
Pipe collarSoil and vent pipesPreformed boot or collar clamped to the pipe
Door thresholdDoor onto a balcony or roof terraceMay drop to 75 mm under an overhanging sill, only with falls away from the door and proper drainage (Bauder)
Check kerbOpen roof edgeA lower kerb, at least 50 mm and usually 75 mm, according to IKO

The upstand uses the roof's own system: felt, EPDM rubber, single ply PVC, liquid coating or mastic asphalt. On EPDM, Permaroof specifies contact adhesive on brick upstands. An angle fillet at the base lets the membrane turn the corner without a sharp 90 degree fold. Under the NFRC's Safe2Torch guidance, as Sika sets it out, timber upstands, fillets and rooflight kerbs are torch free areas, and a self adhesive membrane is used within 900 mm of the nearest combustible material.

How it fails and the signs

Most upstand leaks start at the top edge: sealant above a termination bar cracks, or a flashing or its pointing works loose, and rain runs in behind the membrane. Membranes can also shrink or lose adhesion and pull away from the corner, and old asphalt skirtings sag and crack along the top.

Height is the other fault. Overlaying a roof with thicker insulation raises the surface and can leave an upstand too low. Sika's refurbishment brochure describes raising the perimeter details to suit new insulation. Water that pools against the wall after rain makes a low upstand worse.

From a window you may see a loose flashing, a gap along the top of the covering, moss in the corner, or dark staining on the brick just above the roof. Inside, look for stained plaster where ceiling meets wall. Left alone, water reaches the insulation and the timber deck.

Repair or replace

A roofer first finds where water gets in, which can be above the upstand through porous brick. Small jobs include resealing or refitting a termination bar, refixing and repointing a flashing, and patching a split corner with a compatible material.

It becomes a bigger job when the edge deck is soft, the insulation is wet, or the upstand is too low to reach 150 mm without rebuilding. It is then remade as part of a patch or full replacement of the flat roof. Where the upstand meets lead, the cover flashing is often renewed too.

At a glance

Governing standard
BS 6229:2025, flat roofs with continuously supported flexible waterproof coverings 1
Minimum height
150 mm above the finished roof level (BS 6229:2018, as summarised by Bauder) 2
Measured from
The membrane on an exposed roof; the finished surface, including anything laid over the waterproofing, on other roofs 3
Door thresholds
75 mm under an overhanging sill, only with falls away and drainage 2
Top finished with
Termination bar on water block sealant, or a wall flashing trim 6
Torch free zone
Timber upstands and rooflight kerbs; self adhesive within 900 mm of combustibles 5
Not sure what you are looking at?

Take a photo from the ground, a window or the loft and send it on WhatsApp. We will tell you what it is and whether it needs a visit. Quotes are free and itemised.

Sources

  1. BSI, BS 6229:2025 Flat roofs with continuously supported flexible waterproof coverings. Code of practice (published 16 Dec 2025)
  2. Bauder, Changes to BS 6229:2018
  3. IKO, Upstand requirements for flat roof design (9 Jan 2022)
  4. Bauder, BS 6229:2025 The key changes and implications for flat roof design (May 2026)
  5. Sika Ireland, Safe2Torch and Sika bitumen membranes
  6. Permaroof UK, Roofing Catalogue 2020, PDF p.5, 6, 12, 16
  7. SFS UK, Flat Roofing 2026 UK Catalogue, p.130
  8. Sika, Hospitals and Healthcare Buildings roof refurbishment brochure (Aug 2021), p.6

General information about roofing in England, checked against the sources above when published. It is not a substitute for advice about your own roof.

Questions about the upstand

How high should a flat roof upstand be?
Bauder's summary of BS 6229:2018 gives 150 mm above the finished roof level. IKO measures this from the membrane on an exposed roof, and Bauder from the top of the paving, gravel or planting on a protected or green roof.
Can the upstand be lower at a balcony door?
Yes, in limited cases. Bauder describes a 75 mm upstand under a door sill that overhangs by at least 45 mm, with the roof falling away from the door and an outlet and overflow provided. IKO adds that the membrane should still reach 150 mm in the door reveal and on the abutment wall.
What is the difference between an upstand and a cover flashing?
The upstand is the roof waterproofing itself, turned up the wall. A cover flashing is a separate strip fixed into the wall above that laps down over the top of the upstand, so water running down the wall is carried past the joint. IKO says upstands should go behind cladding or be protected with a proprietary cover flashing.

Want a roofer to check yours?

Book a free inspection and get an itemised quote with photos of what we find, or send us a photo on WhatsApp first.

Hi there 👋Need a roofer in Yorkshire? Message us on WhatsApp.